Search
Contact
E-mail
Catalogue creation
My favorites
Product comparison
DrainLift SANI-L.11T/4 | Wilo
Technical data
Hydraulic data
Maximum operating pressure PN 3 bar
Min. fluid temperature Tmin 3 °C
Max. fluid temperature Tmax 40 °C
Min. ambient temperature Tmin 3 °C
Max. ambient temperature Tmax 40 °C
Max. fluid temperature, for short periods up to 5 min T 65 °C
Sound-pressure level 70 dB
Useable volume at 180 mm inlet height V 65 l
Useable volume at 250 mm inlet height V 90 l
Useable volume at 315 mm inlet height V 105 l
Macerator no
Motor data
Mains connection 3~400 V, 50 Hz
Rated current IN 3.6 A
Protection class IP68
Phase 3
Rated speed n 2850 1/min
Number of poles 2
Activation type Direct On Line (DOL)
Max. switching frequency t 60 1/h
Power consumption P1(Q=max.) of selected impeller * number of pumps P1 2100 W
Operating mode per pump S1
Insulation class F
Materials
Pump housing PP-GF30
Impeller Stainless steel
Shaft Stainless steel
Motor housing Stainless steel
Installation dimensions
Pipe connection on the suction side DNs -
Pipe connection on the discharge side DNd DN 80

DrainLift SANI-L.11 .../L.17 .../L.19 .../L.23 ...

Product data
Brand Wilo
Product description DrainLift SANI-L.11T/4
Article number 2549939
EAN number 4062679007274
Colour green/black
Minimum order quantity 1
Date of sales availability 2020-09-01
Packaging
Packaging type Cardboard box
Packaging property Transport packaging
Pieces per pallet 1
Number per layer 1
Dimension, weight
Length with packaging 875 mm
Length L 852 mm
Height with packaging 800 mm
Height H 620 mm
Width with packaging 655 mm
Width W 635 mm
Gross weight, approx. m 76 kg
Net weight, approx. m 70 kg
Tender text

Compact, ready for connection, and fully submersible double pump lifting unit for pumping sewage containing faeces.

Gas- and watertight collection tank with sloped floor at an angle and an inspection opening with transparent cover.Freely selectable inlets within the marked areas.Level measurement performed with an analogue output signal 4 ... 20 mA.Discharge port attached with a non-return valve including an inspection opening.

Self-cooling motor (sheath flow cooling) with thermal motor monitoring.

Pre-installed switchgear for automatic operation:

  • Operation via display and icon-based, alphanumeric menu
  • Collective fault signal with potential-free contact
  • Individual fault signal with potential-free contact
  • ModBus interface
  • Integrated and mains-independent alarm
  • Adjustable follow-up time
  • 1.5 m connection cable with attached plug

Scope of delivery

  • Lifting unit with switchgear and connection cable with plug
  • Flange connector DN 80 (90 mm)/DN 100 (110 mm)
  • Collar DN 100 (110 mm) for discharge connection
  • HT double socket DN 65 (75 mm) for ventilation connection
  • HT double socket DN 40 (50 mm) for drain connection
  • Inlet set with hole saw 124 mm (5 in) and seal DN 100 (110 mm)
  • Floor fixation set
  • Noise insulation mat
  • 9 V rechargeable battery
  • Installation and operating instructions
Operating Data
Approved field of application
Fluid temperature T 3 °C
Max. fluid temperature, for short periods up to 5 min T 65 °C
Ambient temperature T 3 °C
Maximum operating pressure PN 3 bar
Max. permissible pressure in the pressure pipe P 1.5 bar
Product data
Gross volume of the tank V 137 l
Useable volume at 180 mm inlet height V 65 l
Useable volume at 250 mm inlet height V 90 l
Useable volume at 315 mm inlet height V 105 l
Sound-pressure level 70 dB
Operating mode (non-immersed) S1
Height H 620 mm
Length L 852 mm
Width W 635 mm
Diagonal dimension Diagonal axis 965 mm
Free ball passage of the hydraulics 65 mm
Motor data
Mains connection 3~400 V, 50 Hz
Voltage tolerance ±10 %
Rated power P2 1.5 kW
Rated speed n 2850 1/min
Rated current IN 3.6 A
Insulation class F
Protection class motor IP68
Activation type Direct On Line (DOL)
Max. switching frequency t 60 1/h
Operating mode per pump S1
Motor protection Bimetall
Cable
Connection cable length L 10 m
Cable type H07RN-F
Cable cross-section 6G1 mm²
Mains plug CEE 32A, 3P+N+PE, 6h
Materials
Tank PE
Pump housing PP-GF30
Impeller Stainless steel
Shaft Stainless steel
Gasket material NBR
Motor housing Stainless steel
Installation dimensions
Pipe connection on the suction side DN 100
Pipe connection on the discharge side DN 80
Connection venting Ø 75
Ordering information
Brand Wilo
Product description DrainLift SANI-L.11T/4
Net weight, approx. m 70 kg
Article number 2549939
Documents

Installation and operating instructions

Wilo-DrainLift SANI-L

Article Number 2552854
Edition 2023-06
Number of pages 32
PDF (6 MB)

Wilo-Control EC-L

Article Number 2543252
Edition 2022-09
Number of pages 64
PDF (8 MB)

Certification booklet

Wilo-DrainLift SANI

Article Number 6088777
Edition 2020-06
Number of pages 40
PDF (2 MB)
BIM/CAD

3D_DWG

2549939, DrainLift SANI-L.11T/4

DWG (1 MB)

3D_STEP

2549939, DrainLift SANI-L.11T/4

STP (2 MB)

IFC

2549939, DrainLift SANI-L.11T/4

IFC (2 MB)

2D_DWG_TOP

2549939, DrainLift SANI-L.11T/4

DWG (27 KB)

2549939, DrainLift SANI-L.11T/4

DWG (27 KB)

2D_DWG_FRONT

2549939, DrainLift SANI-L.11T/4

DWG (25 KB)

2D_DWG_RIGHT

2549939, DrainLift SANI-L.11T/4

DWG (26 KB)
Accessory

Mains-independent alarm signal (4)

Stationary dry well installation (14)

Fittings (6)

Installation/setup (11)

Pipes/pipe joints (3)

Alarm signal (8)

Level control (9)

Services

With Wilo as your partner, you can not only be sure of choosing high-quality product solutions, but also of benefiting from a comprehensive, worry-free package of well thought-out services. We collaborate to develop a service concept tailored to your individual needs; with our expertise and personal consultancy, we make sure that the operation of your systems is as energy-efficient, reliable and economical as possible. All the while our competent Wilo service technicians are ready to assist you with fast, reliable and on-time support.

Read more

Recommended services

Maintenance
Maintenance BASIC Lifting stations (Double pump)
    
2219542

In order to ensure and guarantee operational reliability of the pumps/systems, it is recommended to have regular and DIN-compliant inspections and maintenance carried out by the works' own WILO SE Customer Service Department. The tasks are carried out in accordance with DIN 31051 / DIN EN 13306. The tasks comprise the following points:

  • Visual inspection of the pumps/systems
  • Mechanical check
  • Electrical check
  • Testing pressure vessels that may be on hand
  • Review and, if necessary, adjustment of the system parameters
  • Creating a maintenance protocol

Scheduling and organisation is performed by WILO. Other individual maintenance offers are possible on request.

Maintenance COMFORT Lifting stations (Double pump)
    
2219516

In order to ensure and guarantee operational reliability of the pumps/systems, it is recommended to have regular and DIN-compliant inspections and maintenance carried out by the works' own WILO SE Customer Service Department. The tasks are carried out in accordance with DIN 31051 / DIN EN 13306. The tasks comprise the following points:

  • Visual inspection of the pumps/systems
  • Mechanical check
  • Electrical check
  • Testing and possible filling of pressure vessels that may be on hand
  • Review and, if necessary, adjustment of the system parameters
  • Creating a maintenance protocol
  • Consumable materials are included in the contract price
  • Elimination of payroll and travel expenses for deployments between maintenance intervals (during normal service hours)

Scheduling and organisation is performed by WILO. Other individual maintenance offers are possible on request.

Maintenance PREMIUM Lifting stations (Double pump)
    
2219569

In order to ensure and guarantee operational reliability of the pumps/systems, it is recommended to have regular and DIN-compliant inspections and maintenance carried out by the works' own WILO SE Customer Service Department. The tasks are carried out in accordance with DIN 31051 / DIN EN 13306. The tasks comprise the following points:

  • Visual inspection of the pumps/systems
  • Mechanical check
  • Electrical check
  • Testing and possible filling of pressure vessels that may be on hand
  • Checking the system parameters
  • Creating a maintenance protocol
  • Consumable materials are included in the contract price
  • Elimination of payroll and travel expenses for deployments between maintenance intervals (during and outside normal service hours)
  • Software updates
  • Includes wearing parts

Scheduling and organisation is performed by WILO. Other individual maintenance offers are possible on request.

Commissioning
Commissioning Lifting stations (Double pump)
    
2219413

For perfect functioning of the pump(s) / system(s), it is recommended to have the commissioning carried out by the works' own WILO SE Customer Service Department. Optimum setting and efficient operation of the system are ensured as a result. Commissioning is comprised of the following points:

  • Commissioning of system(s) according to checklist
  • Parameterisation and setting of switchgear
  • Testing and adaptation of initial compressing of pressure tanks (filling up to 80 litres incl.)
  • Functional check of fitted system(s)
  • Practice-oriented operation instruction
  • Wilo commissioning protocol

The price for commissioning only applies to system(s) which have been installed in accordance with the installation and operating instructions and state-of-the-art technology. No costs for any materials which may be required are included.