Search
Contact
E-mail
Catalogue creation
My favorites
Product comparison
TOP-Z 80/10 (3~400 V, PN 6, RG) | Wilo
Similar to figure

TOP-Z 80/10 (3~400 V, PN 6, RG)

Article number: 2175532
Technical data
Hydraulic data
Maximum operating pressure PN 6 bar
Delivery head for Qmin H Qmin 9.0 m
Max. volume flow Qmax 67.2 m³/h
Min. fluid temperature for HVAC applications Tmin 0 °C
Max. fluid temperature for HVAC applications Tmax 80 °C
Min. fluid temperature for drinking water applications Tmin 0
Max. fluid temperature for drinking water applications Tmax 80
Max. fluid temperature for drinking water applications in short-time duty (2 hours) Tmax 110 °C
Min. ambient temperature Tmin 0 °C
Max. ambient temperature Tmax 40 °C
Max. permitted total water hardness 3.57 mmol/l (20°dH) (3.21 mmol/l (18°dH) for 20/4 + 25/6)
Motor data
Mains connection 3~400 V, 50 Hz
Rated power P2 1100 W
Rated current IN 2.92 A
Max. speed nmax 2800 1/min
Power consumption P1 min 865 W
Power consumption P1 max 1440 W
Emitted interference EN 61000-6-3
Interference resistance EN 61000-6-2
Protection class motor IPX4D
Insulation class H
Threaded cable connection 2 x PG13.5
Motor protection External protection WSK
Materials
Pump housing Bronze, CC499K
Impeller PPE-GF30
Shaft Stainless steel
Bearing Carbon, synthetic resin-impregnated
Installation dimensions
Pipe connection on the suction side DNs DN 80
Pipe connection on the discharge side DNd DN 80
Port-to-port length L0 360 mm

TOP-Z 80/10 (3~400 V, PN 6, RG)

Mains connection, 3~400 V, 50 Hz

3~230 V, 50 Hz (optional with switching plug 3~230 V)

WSK = thermal winding contact

Full motor protection at all speed stages with optional tripping unit

SK 602N/SK 622N or other switchgear/control devices with WSK connection option

Triggering: External tripping at switchgear/control device

Reset: Automatic fault acknowledgement after cooling off of the motor

Automatic

Product data
Brand Wilo
Product description TOP-Z 80/10 (3~400 V, PN 6, RG)
Article number 2175532
EAN number 4048482742861
Colour green/bronze
Minimum order quantity 1
Date of sales availability 2017-03-01
Packaging
Packaging type Cardboard box
Packaging property Transport packaging
Pieces per pallet 12
Number per layer 4
Dimension, weight
Length with packaging 470 mm
Length L 360 mm
Height with packaging 385 mm
Height H 378 mm
Width with packaging 320 mm
Width W 324 mm
Gross weight, approx. m 34.5 kg
Net weight, approx. m 32.5 kg
Tender text

This circulator is suitable only for drinking water.

Can be used for domestic hot water circulation systems in the industry and building services.

Glandless circulator with screwed or flange connection, preselectable speed stages for power adjustment.

Equipment and function

  • Manual power adjustment with 3 speed stages
  • Pumps with 1~ motor:
    • P2 up to 90 W: internal protection against unacceptably high winding temperatures
    • P2 ≥ 180 W: Full motor protection with thermal winding contacts in conjunction with tripping unit (optional: SK 602N/SK 622N)
  • Pumps with 3~ motor:
    • P2 up to 90 W: internal protection against unacceptably high winding temperatures
    • P2 ≥ 180 W: Full motor protection with thermal winding contacts in conjunction with tripping unit (optional: SK 602N/SK 622N)
  • Mains connection 3~, 230 V with optional switching plug
  • Pump housing in red brass or grey cast iron (stainless steel depending on type)
  • PN 6/PN 10 combination flange (for DN 40 to DN 65)
  • Thermal insulation shells
Operating Data
Max. fluid temperature Tmax 80 °C
Min. fluid temperature Tmin 0 °C
Min. ambient temperature Tmin 0 °C
Max. ambient temperature Tmax 40 °C
Temperature range at max. ambient temperature +40 °C T -20...+110
Maximum operating pressure PN 6 bar
Max. permitted total water hardness 3.57 mmol/l (20°dH) (3.21 mmol/l (18°dH) for 20/4 + 25/6)
Motor data
Emitted interference EN 61000-6-3
Interference resistance EN 61000-6-2
Mains connection 3~400 V, 50 Hz
Power consumption P1 max 1440 W
Max. speed nmax 2800 1/min
Rated current IN 2.92 A
Protection class motor IPX4D
Threaded cable connection
  • 2 x PG13.5
  • 2 x PG9
Materials
Pump housing Bronze, CC499K
Impeller PPE-GF30
Shaft Stainless steel
Bearing Carbon, synthetic resin-impregnated
Installation dimensions
Pipe connection on the suction side DNs DN 80
Pipe connection on the discharge side DNd DN 80
Port-to-port length L0 360 mm
Ordering information
Brand Wilo
Product description TOP-Z 80/10 (3~400 V, PN 6, RG)
Net weight, approx. m 32.5 kg
Article number 2175532
Documents

Installation and operating instructions

Wilo-TOP-Z

Article Number 2202029
Edition 2023-11
Number of pages 220
Language ar, de, el, en, es, fr, it, nl, pt, tr
PDF (4 MB)

Group Statement

Group Statement REACH

Edition 2021-05
Number of pages 5
Language language neutral
PDF (327 KB)
Accessory

Pipe installation (1)

Counter flange kit
Counter flange kit
DN 80, PN 6 counter flange kit
    

Two steel weld neck flanges in accordance with DIN-EN 1092-1 type 11 with a neck for welding to pipes as well as gaskets and screws/nuts for the flange connections.

Depending on the configuration of the operating pressure of an installation, the appropriate counter flange must be selected for the operating pressure.

Scope of delivery

  • 2 weld neck flanges
  • 2 gaskets
  • Screws/nuts (number and size based on flange version)

Pump control (1)

Motor protection (2)

Plug (1)

Services

With Wilo as your partner, you can not only be sure of choosing high-quality product solutions, but also of benefiting from a comprehensive, worry-free package of well thought-out services. We collaborate to develop a service concept tailored to your individual needs; with our expertise and personal consultancy, we make sure that the operation of your systems is as energy-efficient, reliable and economical as possible. All the while our competent Wilo service technicians are ready to assist you with fast, reliable and on-time support.

Read more

Recommended services

Wilo-Live Assistant
Wilo-Live Assistant Service
    
2216415

The Wilo-Live Assistant is a technical advisor at your side during pump service. By using the Wilo-Live Assistant, our expert advisers can support you in the boiler or equipment room via video transmission – live and in real time. You use your smartphone to show the installation set-up, while the Wilo expert follows everything on their screen. They can see the components as well as other details and can thus determine where the fault or breakdown originates. We prevent downtime and ensure operational reliability of your pumps and systems!

The Wilo-Live Assistant includes:

  • Interactive live support via video chat
  • Direct contact with an expert
  • Just-in-time solution to ensure maximum operational reliability of your pumps and systems
System Optimisation
System Optimisation Glandless pumps
    
2219250

The Wilo Service offers proactive system optimisation by optimising settings and doing minor adjustments to ensure operational reliability. System Optimisation includes among others:

  • Overhaul of pumps/systems to restore full performance
  • Addition of new technologies or functions in older systems to save on capital expenditures (retrofitting)
Energy Solutions
Energy Solutions Glandless pumps
    
2219285

Wilo Service offers a proactive support to point out possible energy savings. Our service creates an overview of all installed assets to show how the energy consumption of pumps or systems can be reduced. We offer targeted consultancy and analysis, including the involvement of subsidies as well as comprehensive support around the changeover to high-efficiency technologies. Wilo-Energy solution includes:

  • Detailed assessment of the life cycle costs (LCC analysis)
  • Energy audit including information about energy saving potential
  • Proactive recommendation of replacement options
  • Improving the environmental performance of your system
  • Support in the changeover to Wilo high-efficiency pumps

More suitable services

Extended Warranty
Extended Warranty Glandless pumps
    
2219589

In combination of a new pump or system Wilo offers an extended warranty of up to five years in combination with commissioning and maintenance by the Wilo Service.

Extended warranty includes:

  • Full protection and predictable cost security
  • Regular maintenance work by the Wilo Service
Supervision
Supervision Glandless pumps
    
2219320

Wilo supports during the concept phase to ensure quality work and cost efficiency. Our competent and qualified Wilo Service will support you with recommendations and technical advice throughout the entire project.

Supervision includes:

  • Regular on-site visits ensure the quality of information and advice
  • Technical consultancy, also available on site
  • Status report with recommendations after the visit
  • Comprehensive support from a Wilo expert
Installation
Installation Glandless pumps
    
2219355

The Wilo service offers installation of our pumps or pumping systems. We offer an end-to-end process from gathering information on site to installing our product in the overall plant. An optimal installation set-up and the interaction of various individual factors lay the foundation for long-term operational safety.

Installation includes:

  • Professional inspection
  • Provision of components/materials from Wilo and third-party suppliers
  • Installation of pipelines and electronics
  • Test runs
Commissioning
Commissioning Glandless pumps
    
2219390

For perfect functioning of the pump(s) / system(s), it is recommended to have the commissioning carried out by the works' own WILO SE Customer Service Department. Optimum setting and efficient operation of the system are ensured as a result. Commissioning is comprised of the following points:

  • Commissioning of system(s) according to checklist
  • Parameterisation and setting of switchgear
  • Testing and adaptation of initial compressing of pressure tanks (filling up to 80 litres incl.)
  • Functional check of fitted system(s)
  • Practice-oriented operation instruction
  • Wilo commissioning protocol

The price for commissioning only applies to system(s) which have been installed in accordance with the installation and operating instructions and state-of-the-art technology. No costs for any materials which may be required are included.

Maintenance
Maintenance BASIC Glandless pumps
    
2219530

In order to ensure and guarantee operational reliability of the pumps/systems, it is recommended to have regular and DIN-compliant inspections and maintenance carried out by the works' own WILO SE Customer Service Department. The tasks are carried out in accordance with DIN 31051 / DIN EN 13306. The tasks comprise the following points:

  • Visual inspection of the pumps/systems
  • Mechanical check
  • Electrical check
  • Testing pressure vessels that may be on hand
  • Review and, if necessary, adjustment of the system parameters
  • Creating a maintenance protocol

Scheduling and organisation is performed by WILO. Other individual maintenance offers are possible on request.

Maintenance COMFORT Glandless pumps
    
2219416

In order to ensure and guarantee operational reliability of the pumps/systems, it is recommended to have regular and DIN-compliant inspections and maintenance carried out by the works' own WILO SE Customer Service Department. The tasks are carried out in accordance with DIN 31051 / DIN EN 13306. The tasks comprise the following points:

  • Visual inspection of the pumps/systems
  • Mechanical check
  • Electrical check
  • Testing and possible filling of pressure vessels that may be on hand
  • Review and, if necessary, adjustment of the system parameters
  • Creating a maintenance protocol
  • Consumable materials are included in the contract price
  • Elimination of payroll and travel expenses for deployments between maintenance intervals (during normal service hours)

Scheduling and organisation is performed by WILO. Other individual maintenance offers are possible on request.

Maintenance PREMIUM Glandless pumps
    
2219545

In order to ensure and guarantee operational reliability of the pumps/systems, it is recommended to have regular and DIN-compliant inspections and maintenance carried out by the works' own WILO SE Customer Service Department. The tasks are carried out in accordance with DIN 31051 / DIN EN 13306. The tasks comprise the following points:

  • Visual inspection of the pumps/systems
  • Mechanical check
  • Electrical check
  • Testing and possible filling of pressure vessels that may be on hand
  • Checking the system parameters
  • Creating a maintenance protocol
  • Consumable materials are included in the contract price
  • Elimination of payroll and travel expenses for deployments between maintenance intervals (during and outside normal service hours)
  • Software updates
  • Includes wearing parts

Scheduling and organisation is performed by WILO. Other individual maintenance offers are possible on request.

Repair
Repair Glandless pumps
    
2219609

Wilo Service draws on their competence and experience while consulting on site to decide whether the pump can actually be repaired on site or has to be sent in for a factory repair. Wilo also provides spare parts or a replacement pump to restore the operational reliability of the system.

Repair includes:

  • Verification and elimination of error causes by experienced Wilo experts
  • Non-binding estimate for repairs
  • Electric-hydraulic test run to ensure correct data regarding functionality, quality and performance of the pump or system
  • Coating of various pump or system components for an optimised efficiency factor
  • Use of genuine spare parts only
  • Documentation of the repair in the service report