Hydraulic data
Maximum operating pressure PN 10 bar
Min. fluid temperature for HVAC applications Tmin 0 °C
Max. fluid temperature for HVAC T 80 °C
Min. ambient temperature Tmin 0 °C
Max. ambient temperature Tmax 40 °C
Max. permitted total water hardness 3.57 mmol/l (20°dH)
Motor data
Energy efficiency index (EEI) ≤0.20
Mains connection 1~230 V, 50/60 Hz
Rated power P2 0.67 kW
Rated current IN 3.5 A
Min. speed nmin 800 1/min
Max. speed nmax 3500 1/min
Power consumption P1 min 30 W
Power consumption P1 max 800 W
Emitted interference EN 61800-3;2004+A1;2012 /residential area (C1)
Interference resistance EN 61800-3;2004+A1;2012 /industrial environment (C2)
Speed control Frequency converter
Insulation class F
Protection class motor IPX4D
Motor protection Internal protection overheating and overcurrent
Materials
Pump housing Stainless steel
Impeller PPS-GF40
Shaft Stainless steel
Bearing Carbon, synthetic resin-impregnated
Installation dimensions
Pipe connection on the suction side DNs DN 40
Pipe connection on the discharge side DNd DN 40
Port-to-port length L0 250 mm
Function
Control mode
  • Δp-v for variable differential pressure
  • Δp-c for constant differential pressure
  • Constant speed (3 speed stages)
Multi pump operation Main/Standby (with Connect Module Yonos MAXO)
Display Setpoint
Equipment
Approvals and labels
  • CE
  • VDE
  • EAC
Display LED segment display
Display information Basic Versio n: LED display (small) for showing the set head or speed stage.
Pump control Electronic-controlled pump
Quick electrical connection Wilo plug
Connectivity
Digital input Ext. OFF (via accessories Wilo-Connect module Yonos MAXO)
Digital output
  • SSM
  • SBM (via Connect module)

Yonos MAXO-Z 40/0,5-16 PN 6/10

Product data
Brand Wilo
Product description Yonos MAXO-Z 40/0,5-16 PN 6/10
Article number 2219221
EAN number 4062679244174
Colour green/silver
Minimum order quantity 1
Date of sales availability 2022-11-15
Packaging
Packaging type Cardboard box
Packaging property Transport packaging
Pieces per pallet 8
Number per layer 4
Dimension, weight
Length with packaging 400 mm
Length L 329 mm
Height with packaging 600 mm
Height H 385 mm
Width with packaging 525 mm
Width W 150 mm
Gross weight, approx. m 24.5 kg
Net weight, approx. m 21.3 kg
Tender text

High-efficiency pump Wilo-Yonos MAXO-Z

electronically controlled,

Glandless circulator, synchronous motor according to ECM technology and integrated power control for continuous differential pressure control. Can be used for all domestic hot water circulation systems in industry and building services.

Standard-equipped with:

  • Preselectable control modes for optimum load adjustment: Δp-c (constant differential pressure), Δp-v (variable differential pressure)
  • 3 speed stages (n = constant)
  • LED for setting the setpoint and displaying error messages
  • Electrical connection with the Wilo plug
  • Fault signal light and contact for collective fault signal

For flange-end pumps - flange versions:

  • Standard version for DN 32 to DN 65 pumps: Combination flange PN 6/10 (flange PN 16 in accordance with EN 1092-2) for counter flanges PN 6 and PN 10
Operating Data
Max. fluid temperature Tmax 80 °C
Min. fluid temperature Tmin 0 °C
Min. ambient temperature Tmin 0 °C
Max. ambient temperature Tmax 40 °C
Temperature range at max. ambient temperature +40 °C T -20...+110
Maximum operating pressure PN 10 bar
Minimum suction head at 50 °C m 3 m
Minimum suction head at 95 °C m 10 m
Minimum suction head at 110 °C 16 m
Max. permitted total water hardness 3.57 mmol/l (20°dH)
Motor data
Energy efficiency index (EEI) ≤0.20
Emitted interference EN 61800-3;2004+A1;2012 /residential area (C1)
Interference resistance EN 61800-3;2004+A1;2012 /industrial environment (C2)
Mains connection 1~230 V, 50/60 Hz
Power consumption P1 max 800 W
Min. speed nmin 800 1/min
Max. speed nmax 3500 1/min
Protection class motor IPX4D
Threaded cable connection 2 x M20x1.5
Materials
Pump housing Stainless steel
Impeller PPS-GF40
Shaft Stainless steel
Bearing Carbon, synthetic resin-impregnated
Installation dimensions
Pipe connection on the suction side DNs DN 40
Pipe connection on the discharge side DNd DN 40
Port-to-port length L0 250 mm
Ordering information
Brand Wilo
Product description Yonos MAXO-Z 40/0,5-16 PN 6/10
Net weight, approx. m 21.3 kg
Article number 2219221
Documents

Installation and operating instructions

Wilo-Yonos MAXO/-D/-Z

Article Number 2226411
Edition 2023-12
Number of pages 392
Language da, de, el, en, es, fi, fr, it, nl, no, pt, sv, tr
PDF (9 MB)

Wilo-Yonos MAXO/-D/-Z

Article Number 2226410
Edition 2023-12
Number of pages 36
Language en
PDF (7 MB)

Group Statement

Group Statement REACH

Edition 2021-05
Number of pages 5
Language language neutral
PDF (327 KB)
BIM/CAD
Accessory

Pipe installation (2)

Pipe installation, adapter fitting (2)

Pump control/interface module (1)

Connect module Yonos MAXO
Connect module Yonos MAXO
Wilo-Connect module Yonos MAXO
    

The Wilo-Connect module Yonos MAXO is a retrofittable plug-in module for Wilo-Yonos MAXO/Yonos MAXO-D/Yonos MAXO-Z pumps.

The Wilo-Connect module Yonos MAXO is installed on the electronic module of the pump at the position of the Wilo plug.

Utilisation of the Wilo-Connect moduleYonos MAXO dispenses with external contactors and other switchgears as well as the associated installation workload. The load of customer-side switchgears (relays) due to high starting currents is reduced to a minimum by the Connect module Yonos MAXO.

Equipment/function

  • Run signal display
  • SSM collective fault signal as potential-free NC contact
  • SBM collective run signal as potential-free NO contact
  • Overriding Off control input (External Off)
  • Integrated dual pump management with the functions:
    • Main/standby operation with runtime-dependent (24 h) switchover from main to standby pump
    • Fault-sensitive switchover to operational standby pump

Mains terminals

Terminal cross-section: max. 2.5 mm2

Signal terminals

Max. switching capacity: 250 V/1 A

Terminal cross-section: max. 1.5 mm2

Control terminal Ext. Off

Contact rating: 24 V DC, 10 mA

Terminal cross-section: min. 0.75 mm2, max. 1.5 mm2

Scope of delivery

Wilo-Connect module Yonos MAXO

2 fastening screws for cover installation

4 threaded cable glands M16

Installation and operating instructions

Services

With Wilo as your partner, you can not only be sure of choosing high-quality product solutions, but also of benefiting from a comprehensive, worry-free package of well thought-out services. We collaborate to develop a service concept tailored to your individual needs; with our expertise and personal consultancy, we make sure that the operation of your systems is as energy-efficient, reliable and economical as possible. All the while our competent Wilo service technicians are ready to assist you with fast, reliable and on-time support.

Read more

Recommended services

Wilo-Live Assistant
Wilo-Live Assistant Service
    
2216415

The Wilo-Live Assistant is a technical advisor at your side during pump service. By using the Wilo-Live Assistant, our expert advisers can support you in the boiler or equipment room via video transmission – live and in real time. You use your smartphone to show the installation set-up, while the Wilo expert follows everything on their screen. They can see the components as well as other details and can thus determine where the fault or breakdown originates. We prevent downtime and ensure operational reliability of your pumps and systems!

The Wilo-Live Assistant includes:

  • Interactive live support via video chat
  • Direct contact with an expert
  • Just-in-time solution to ensure maximum operational reliability of your pumps and systems
System Optimisation
System Optimisation Glandless pumps
    
2219250

The Wilo Service offers proactive system optimisation by optimising settings and doing minor adjustments to ensure operational reliability. System Optimisation includes among others:

  • Overhaul of pumps/systems to restore full performance
  • Addition of new technologies or functions in older systems to save on capital expenditures (retrofitting)
Energy Solutions
Energy Solutions Glandless pumps
    
2219285

Wilo Service offers a proactive support to point out possible energy savings. Our service creates an overview of all installed assets to show how the energy consumption of pumps or systems can be reduced. We offer targeted consultancy and analysis, including the involvement of subsidies as well as comprehensive support around the changeover to high-efficiency technologies. Wilo-Energy solution includes:

  • Detailed assessment of the life cycle costs (LCC analysis)
  • Energy audit including information about energy saving potential
  • Proactive recommendation of replacement options
  • Improving the environmental performance of your system
  • Support in the changeover to Wilo high-efficiency pumps

More suitable services

Extended Warranty
Extended Warranty Glandless pumps
    
2219589

In combination of a new pump or system Wilo offers an extended warranty of up to five years in combination with commissioning and maintenance by the Wilo Service.

Extended warranty includes:

  • Full protection and predictable cost security
  • Regular maintenance work by the Wilo Service
Supervision
Supervision Glandless pumps
    
2219320

Wilo supports during the concept phase to ensure quality work and cost efficiency. Our competent and qualified Wilo Service will support you with recommendations and technical advice throughout the entire project.

Supervision includes:

  • Regular on-site visits ensure the quality of information and advice
  • Technical consultancy, also available on site
  • Status report with recommendations after the visit
  • Comprehensive support from a Wilo expert
Installation
Installation Glandless pumps
    
2219355

The Wilo service offers installation of our pumps or pumping systems. We offer an end-to-end process from gathering information on site to installing our product in the overall plant. An optimal installation set-up and the interaction of various individual factors lay the foundation for long-term operational safety.

Installation includes:

  • Professional inspection
  • Provision of components/materials from Wilo and third-party suppliers
  • Installation of pipelines and electronics
  • Test runs
Commissioning
Commissioning Glandless pumps
    
2219390

For perfect functioning of the pump(s) / system(s), it is recommended to have the commissioning carried out by the works' own WILO SE Customer Service Department. Optimum setting and efficient operation of the system are ensured as a result. Commissioning is comprised of the following points:

  • Commissioning of system(s) according to checklist
  • Parameterisation and setting of switchgear
  • Testing and adaptation of initial compressing of pressure tanks (filling up to 80 litres incl.)
  • Functional check of fitted system(s)
  • Practice-oriented operation instruction
  • Wilo commissioning protocol

The price for commissioning only applies to system(s) which have been installed in accordance with the installation and operating instructions and state-of-the-art technology. No costs for any materials which may be required are included.

Maintenance
Maintenance BASIC Glandless pumps
    
2219530

In order to ensure and guarantee operational reliability of the pumps/systems, it is recommended to have regular and DIN-compliant inspections and maintenance carried out by the works' own WILO SE Customer Service Department. The tasks are carried out in accordance with DIN 31051 / DIN EN 13306. The tasks comprise the following points:

  • Visual inspection of the pumps/systems
  • Mechanical check
  • Electrical check
  • Testing pressure vessels that may be on hand
  • Review and, if necessary, adjustment of the system parameters
  • Creating a maintenance protocol

Scheduling and organisation is performed by WILO. Other individual maintenance offers are possible on request.

Maintenance COMFORT Glandless pumps
    
2219416

In order to ensure and guarantee operational reliability of the pumps/systems, it is recommended to have regular and DIN-compliant inspections and maintenance carried out by the works' own WILO SE Customer Service Department. The tasks are carried out in accordance with DIN 31051 / DIN EN 13306. The tasks comprise the following points:

  • Visual inspection of the pumps/systems
  • Mechanical check
  • Electrical check
  • Testing and possible filling of pressure vessels that may be on hand
  • Review and, if necessary, adjustment of the system parameters
  • Creating a maintenance protocol
  • Consumable materials are included in the contract price
  • Elimination of payroll and travel expenses for deployments between maintenance intervals (during normal service hours)

Scheduling and organisation is performed by WILO. Other individual maintenance offers are possible on request.

Maintenance PREMIUM Glandless pumps
    
2219545

In order to ensure and guarantee operational reliability of the pumps/systems, it is recommended to have regular and DIN-compliant inspections and maintenance carried out by the works' own WILO SE Customer Service Department. The tasks are carried out in accordance with DIN 31051 / DIN EN 13306. The tasks comprise the following points:

  • Visual inspection of the pumps/systems
  • Mechanical check
  • Electrical check
  • Testing and possible filling of pressure vessels that may be on hand
  • Checking the system parameters
  • Creating a maintenance protocol
  • Consumable materials are included in the contract price
  • Elimination of payroll and travel expenses for deployments between maintenance intervals (during and outside normal service hours)
  • Software updates
  • Includes wearing parts

Scheduling and organisation is performed by WILO. Other individual maintenance offers are possible on request.

Repair
Repair Glandless pumps
    
2219609

Wilo Service draws on their competence and experience while consulting on site to decide whether the pump can actually be repaired on site or has to be sent in for a factory repair. Wilo also provides spare parts or a replacement pump to restore the operational reliability of the system.

Repair includes:

  • Verification and elimination of error causes by experienced Wilo experts
  • Non-binding estimate for repairs
  • Electric-hydraulic test run to ensure correct data regarding functionality, quality and performance of the pump or system
  • Coating of various pump or system components for an optimised efficiency factor
  • Use of genuine spare parts only
  • Documentation of the repair in the service report