Search
Contact
E-mail
Catalogue creation
My favorites
Product comparison
Sub TWI 5-SE-304EM-PnP/3 | Wilo
Similar to figure

Sub TWI 5-SE-304EM-PnP/3

Article number: 2543632
Technical data
Hydraulic data
Maximum operating pressure PN 10 bar
Max. sand content 50 g/m³
Max. immersion depth 17 m
Min. fluid temperature Tmin 5 °C
Max. fluid temperature Tmax 35 °C
Motor data
Mains connection 1~230 V, 50 Hz
Rated power P2 0.55 kW
Rated speed n 2810 1/min
Rated current IN 4.5 A
Starting current I 20.25 A
Activation type Direct On Line (DOL)
Power factor cos φ100 0.91
Max. switching frequency t 40 1/h
Protection class motor IP68
Motor diameter DM 127 mm
Cable
Connection cable length L 20 m
Cable cross-section 4G1 mm²
Materials
Pump housing Stainless steel
Impeller Stainless steel
Shaft Stainless steel
Motor housing Stainless steel
Installation dimensions
Pipe connection on the discharge side DNd Rp 1¼

TWI 5

Product data
Brand Wilo
Product description Sub TWI 5-SE-304EM-PnP/3
Article number 2543632
EAN number 4048482504636
Colour Green/black/silver
Minimum order quantity 1
Date of sales availability 2015-03-01
Packaging
Packaging type Cardboard box
Packaging property Sales packaging
Pieces per pallet 5
Number per layer 5
Dimension, weight
Length with packaging 770 mm
Length L 175 mm
Height with packaging 190 mm
Height H 539 mm
Width with packaging 650 mm
Width W 129 mm
Gross weight, approx. m 22.5 kg
Net weight, approx. m 20.5 kg
Tender text

Fully submersible, multistage, self-venting submersible pump with an Rp 1¼ suction port (for optional connection of floating suction filters), and pedestal (including 4 vibration absorbers) for floor installation. For pumping clean water from tanks, rainwater storage tanks or wells up to an immersion depth of 17 m.

Pump with AC version. Setup possible outside of the water.

Complete with 20 m connection cable, switchbox (IP56) with thermal motor protection, ON/OFF switch and 2 m connection cable with shock-proof plug.

Safety rope made of polypropylene

All parts that come into contact with the fluid are corrosion-proof.

All components necessary for basic installation are included in the scope of delivery. These include:

  • Pump
  • Complete control
  • Cable, safety cable
  • Cable tie, floating fine suction filter
  • Suction hose 1.5 m
Operating Data
Max. delivery head Hmax 44.4 m
Unit
Pipe connection on the discharge side DNd Rp 1¼
Maximum operating pressure p 10.0 bar
Max. sand content 50 g/m³
Protection class motor IP68
Max. immersion depth 17 m
Min. fluid temperature Tmin 5 °C
Max. fluid temperature Tmax 35 °C
Net weight, approx. m 20.5 kg
Max. diameter Dmax 129 mm
Motor data
Motor design Submersible motor
Mains connection 1~230 V, 50 Hz
Rated power P2 0.55 kW
Rated speed n 2810 1/min
Rated current IN 4.5 A
Activation type Direct On Line (DOL)
Max. switching frequency t 40 1/h
Motor diameter DM 127 mm
Cable
Connection cable length L 20 m
Cable cross-section 4G1 mm²
Materials
Pump housing Stainless steel
Motor housing Stainless steel
Shaft Stainless steel
Impeller Stainless steel
Ordering information
Net weight, approx. m 20.5 kg
Brand Wilo
Product description Sub TWI 5-SE-304EM-PnP/3
Article number 2543632
Documents

Installation and operating instructions

Wilo-TWI 5, Wilo-TWI 5-SE

Article Number 4104146
Edition 1304
Number of pages 104
Language bg, en, et, hr, hu, lt, lv, mk, no, sk, sl, sr, uk
PDF (1 MB)

Wilo-TWI 5, Wilo-TWI 5-SE

Article Number 4104146
Edition 1304
Number of pages 14
Language en
PDF (699 KB)

Wilo-TWI 5, Wilo-TWI 5-SE

Article Number 4104146
Edition 1304
Number of pages 17
Language en
PDF (2 MB)

Wilo-HiControl1

Article Number 4196363
Edition 2024-07
Number of pages 88
Language de, el, en, fr, it, nl, ru, tr
PDF (1 MB)

Group Statement

Group Statement REACH

Edition 2021-05
Number of pages 5
Language language neutral
PDF (327 KB)
Accessory

Installation/setup (1)

Wall fixation/installation on a base (1)

Break tank/accessories (1)

Level indicator AF 400
Level indicator AF 400
Level indicator AF 400
    

The level indicator makes it possible to display the cistern level when using rainwater. The integrated level sensor records the percentage cistern volume up to a level of 5 m.

Separate unit without communication with the AF400

Scope of delivery

  • Ready-for-connection switchbox 230 V / 50Hz for installation in buildings
  • Level sensor 0 – 5 mWS with 20m-long cable for connection with the level indicator
  • Installation and operating instructions
Services

With Wilo as your partner, you can not only be sure of choosing high-quality product solutions, but also of benefiting from a comprehensive, worry-free package of well thought-out services. We collaborate to develop a service concept tailored to your individual needs; with our expertise and personal consultancy, we make sure that the operation of your systems is as energy-efficient, reliable and economical as possible. All the while our competent Wilo service technicians are ready to assist you with fast, reliable and on-time support.

Read more

Recommended services

Wilo-Live Assistant
Wilo-Live Assistant Service
    
2216415

The Wilo-Live Assistant is a technical advisor at your side during pump service. By using the Wilo-Live Assistant, our expert advisers can support you in the boiler or equipment room via video transmission – live and in real time. You use your smartphone to show the installation set-up, while the Wilo expert follows everything on their screen. They can see the components as well as other details and can thus determine where the fault or breakdown originates. We prevent downtime and ensure operational reliability of your pumps and systems!

The Wilo-Live Assistant includes:

  • Interactive live support via video chat
  • Direct contact with an expert
  • Just-in-time solution to ensure maximum operational reliability of your pumps and systems

More suitable services

Supervision
Supervision borehole/submersible pump TWU/TWI 3"-5"
    
2219331

Wilo supports during the concept phase to ensure quality work and cost efficiency. Our competent and qualified Wilo Service will support you with recommendations and technical advice throughout the entire project.

Supervision includes:

  • Regular on-site visits ensure the quality of information and advice
  • Technical consultancy, also available on site
  • Status report with recommendations after the visit
  • Comprehensive support from a Wilo expert
Installation
Installation borehole/submersible pump TWU/TWI 3"-5"
    
2219366

The Wilo service offers installation of our pumps or pumping systems. We offer an end-to-end process from gathering information on site to installing our product in the overall plant. An optimal installation set-up and the interaction of various individual factors lay the foundation for long-term operational safety.

Installation includes:

  • Professional inspection
  • Provision of components/materials from Wilo and third-party suppliers
  • Installation of pipelines and electronics
  • Test runs
Commissioning
Commissioning borehole/submersible pump TWU/TWI 3"-5"
    
2219397

For perfect functioning of the pump(s) / system(s), it is recommended to have the commissioning carried out by the works' own WILO SE Customer Service Department. Optimum setting and efficient operation of the system are ensured as a result. Commissioning is comprised of the following points:

  • Commissioning of system(s) according to checklist
  • Parameterisation and setting of switchgear
  • Testing and adaptation of initial compressing of pressure tanks (filling up to 80 litres incl.)
  • Functional check of fitted system(s)
  • Practice-oriented operation instruction
  • Wilo commissioning protocol

The price for commissioning only applies to system(s) which have been installed in accordance with the installation and operating instructions and state-of-the-art technology. No costs for any materials which may be required are included.

Maintenance
Maintenance BASIC borehole/submersible pump TWU/TWI 3"-5"
    
2219537

In order to ensure and guarantee operational reliability of the pumps/systems, it is recommended to have regular and DIN-compliant inspections and maintenance carried out by the works' own WILO SE Customer Service Department. The tasks are carried out in accordance with DIN 31051 / DIN EN 13306. The tasks comprise the following points:

  • Visual inspection of the pumps/systems
  • Mechanical check
  • Electrical check
  • Testing pressure vessels that may be on hand
  • Review and, if necessary, adjustment of the system parameters
  • Creating a maintenance protocol

Scheduling and organisation is performed by WILO. Other individual maintenance offers are possible on request.

Maintenance COMFORTborehole/submersible pump TWU/TWI 3"-5"
    
2219499

In order to ensure and guarantee operational reliability of the pumps/systems, it is recommended to have regular and DIN-compliant inspections and maintenance carried out by the works' own WILO SE Customer Service Department. The tasks are carried out in accordance with DIN 31051 / DIN EN 13306. The tasks comprise the following points:

  • Visual inspection of the pumps/systems
  • Mechanical check
  • Electrical check
  • Testing and possible filling of pressure vessels that may be on hand
  • Review and, if necessary, adjustment of the system parameters
  • Creating a maintenance protocol
  • Consumable materials are included in the contract price
  • Elimination of payroll and travel expenses for deployments between maintenance intervals (during normal service hours)

Scheduling and organisation is performed by WILO. Other individual maintenance offers are possible on request.

Maintenance PREMIUM borehole/submersible pump TWU/TWI 3"-5"
    
2219552

In order to ensure and guarantee operational reliability of the pumps/systems, it is recommended to have regular and DIN-compliant inspections and maintenance carried out by the works' own WILO SE Customer Service Department. The tasks are carried out in accordance with DIN 31051 / DIN EN 13306. The tasks comprise the following points:

  • Visual inspection of the pumps/systems
  • Mechanical check
  • Electrical check
  • Testing and possible filling of pressure vessels that may be on hand
  • Checking the system parameters
  • Creating a maintenance protocol
  • Consumable materials are included in the contract price
  • Elimination of payroll and travel expenses for deployments between maintenance intervals (during and outside normal service hours)
  • Software updates
  • Includes wearing parts

Scheduling and organisation is performed by WILO. Other individual maintenance offers are possible on request.

System Optimisation
System Optimisation borehole/submersible pump TWU/TWI 3"-5"
    
2219261

The Wilo Service offers proactive system optimisation by optimising settings and doing minor adjustments to ensure operational reliability. System Optimisation includes among others:

  • Overhaul of pumps/systems to restore full performance
  • Addition of new technologies or functions in older systems to save on capital expenditures (retrofitting)
Energy Solutions
Energy Solutions borehole/submersible pump TWU/TWI 3"-5"
    
2219296

Wilo Service offers a proactive support to point out possible energy savings. Our service creates an overview of all installed assets to show how the energy consumption of pumps or systems can be reduced. We offer targeted consultancy and analysis, including the involvement of subsidies as well as comprehensive support around the changeover to high-efficiency technologies. Wilo-Energy solution includes:

  • Detailed assessment of the life cycle costs (LCC analysis)
  • Energy audit including information about energy saving potential
  • Proactive recommendation of replacement options
  • Improving the environmental performance of your system
  • Support in the changeover to Wilo high-efficiency pumps
Repair
Repair borehole/submersible pump TWU/TWI 3"-5"
    
2219620

Wilo Service draws on their competence and experience while consulting on site to decide whether the pump can actually be repaired on site or has to be sent in for a factory repair. Wilo also provides spare parts or a replacement pump to restore the operational reliability of the system.

Repair includes:

  • Verification and elimination of error causes by experienced Wilo experts
  • Non-binding estimate for repairs
  • Electric-hydraulic test run to ensure correct data regarding functionality, quality and performance of the pump or system
  • Coating of various pump or system components for an optimised efficiency factor
  • Use of genuine spare parts only
  • Documentation of the repair in the service report