Search
Contact
E-mail
Catalogue creation
My favorites
Product comparison

References

Inaugurated in October 2003, ABC Mall Achrafieh was designed by BDP, a UK architecture firm, and is the first open air mall up to international standards, in the Middle East.#

Located in the heart of the capital, ABC Mall Achrafieh offers a wide spectrum of stores in an entertaining environment with 8 movie theatres,
20 cafés and restaurants as well as an 850 sqm kids playground.

  • 20,000 sqm of built up area with 35,000 sqm of GLA
  • More than 200 renowned stores: H&M, Hugo, Boss, Lancel, Mango, Nokia, Sony World, Virgin Megastore and many others
  • 1,200 parking spaces

Wilo Lebanon supplied the HVAC pumps, Boosters and submersible pumps for the entire mall. Wilo Lebanon service team continue to provide support to the store maintenance team since the opening of the mall.

The largest cement factory in Lebanon, “Cimenterie National” is not relying on the power provided by the countries’ power generation. It has built its own power generation plant. This plant required excessive cooling. For that purpose and because the factory is direct on the sea. Offshore design borehole pumps were used and installed to pump sea water to the heat exchangers of the power plant.

The borehole pump used were: D 500 and K 127

  • Saifi II Residential Coumpound
  • Jardin de Tabaris
  • LAU Beirut
  • Sabis International school
  • Taj Tower
  • AUB – Biology Department
  • Pavillion – Mouawad Business
  • Belle Vue Hospital
  • Studio Vision
  • Bloc 24 – Karagulla
  • Capelec Industries
  • Cement Factory
  • Byblos Tower
  • ABC Dbaye
  • Balamand University
  • Grand Hills
  • Lexus showroom
  • Carrefour Supermarket
  • Supervalue Mall
  • Harbour Tower
  • Lebanese University- Hadath Campus
  • Dana
  • Banque Audi, Branches and Data center
  • Shayboub Tower
  • Berytus Park
  • Attenee School