Suche
Kontakt
E-Mail
Katalogerstellung
Meine Favoriten
Produktvergleich
CronoNorm-NLG 250/360-90/4 | Wilo
Similar to figure

CronoNorm-NLG 250/360-90/4

Article number : 6096476
EUR 37,130.-
Price (excl. VAT)
Price group : PG4
Technical data
Hydraulic data
Maximum operating pressure PN 16 bar
Min. fluid temperature Tmin -20 °C
Max. fluid temperature Tmax 120 °C
Min. ambient temperature Tmin -15 °C
Max. ambient temperature Tmax 40 °C
Motor data
Mains connection 3~400 V, 50 Hz
Voltage tolerance ±10 %
Rated power P2 90 kW
Motor efficiency class IE4
Rated current IN 157 A
Rated speed n 1485 1/min
Power factor cos φ100 0,86
Insulation class F
Protection class motor IP55
Installation dimensions
Pipe connection on the suction side DNs DN 300
Pipe connection on the discharge side DNd DN 250
Materials
Pump housing Ductile cast iron
Impeller Grey cast iron
Shaft Stainless steel
Mechanical seal AQ1EGG
Lantern Ductile cast iron

NLG

Dimensions A1 14 mm
Dimensions A2 250 mm
Dimensions B2 860 mm
Dimensions H 945 mm
Dimensions H1 350 mm
Dimensions H2 475 mm
Dimensions H3 473 mm
Dimensions L 2170 mm
Dimensions L1 2140 mm
Dimensions L2 370 mm
Dimensions L4 2205 mm
Dimensions S1 435 mm
Dimensions S2 22 mm
Dimensions X 180 mm
Dimensions Ød 48 mm
Dimensions DN1 DN 300
Dimensions DN2 DN 250
Prices
Price (excl. VAT) EUR 37,130.-
Price group PG4
Product data
Brand Wilo
Product description CronoNorm-NLG 250/360-90/4
Article number 6096476
EAN number 4062679337623
Minimum order quantity 1
Date of sales availability 2010-01-01
Previous model article number 4459321
Previous model designation CronoNorm-NLG 250/360-90/4
Packaging
Packaging type One-way pallet
Packaging property Transport packaging
Pieces per pallet 1
Number per layer 1
Dimension, weight
Length with packaging 2500 mm
Length L 2205 mm
Height with packaging 1138 mm
Height H 948 mm
Width with packaging 1563,9 mm
Width W 860 mm
Gross weight, approx. m 1563,9 kg
Tender text

Single-stage centrifugal pump as baseplate pump. With axial suction port and radial discharge port, for installation on a base. Pump with support foot and flanged bearing bracket, elastic spacer coupling, coupling guard and motor mounted to same baseplate.

IEC motor with 3 PTC thermistor sensors. Shaft sealing via non-cooled mechanical seal up to max. 120 °C. Spheroidal cast iron housing, stainless steel shaft, grey cast iron impeller (bronze impeller available at additional charge).

Materials
Pump housing Ductile cast iron
Impeller Grey cast iron
Lantern Ductile cast iron
Shaft Stainless steel
Shaft seal AQ1EGG
Operating Data
Min. fluid temperature Tmin -20 °C
Max. fluid temperature Tmax 120 °C
Maximum operating pressure p 16,0 bar
Max. ambient temperature Tmax 40 °C
Minimum efficiency index (MEI) ≥0,4
Motor data
Mains connection 3~400 V, 50 Hz
Voltage tolerance ±10 %
Motor efficiency class IE4
Rated power P2 90000 W
Rated speed n 1485 1/min
Rated current IN 157 A
Power factor cos φ100 0,86
Motor efficiency 50% ηM 50% 95,9 %
Motor efficiency 75% ηM 75% 96,3 %
Motor efficiency 100% ηM 100% 96,4 %
Protection class IP55
Insulation class F
Installation dimensions
Pipe connection on the suction side DNs DN 300
Pipe connection on the discharge side DNd DN 250
Ordering information
Brand Wilo
Product description CronoNorm-NLG 250/360-90/4
Article number 6096476
Documents
Accessory

Pump control (1)

Pump control/accessories (31)

Differential pressure detection (7)

Motor protection (1)

Services

With Wilo as your partner, you can not only be sure of choosing high-quality product solutions, but also of benefiting from a comprehensive, worry-free package of well thought-out services. We collaborate to develop a service concept tailored to your individual needs; with our expertise and personal consultancy, we make sure that the operation of your systems is as energy-efficient, reliable and economical as possible. All the while our competent Wilo service technicians are ready to assist you with fast, reliable and on-time support.

Read more

Recommended services

Commissioning
Commissioning Norm-/SCP pumps
    

For perfect functioning of the pump(s) / system(s), it is recommended to have the commissioning carried out by the works' own WILO SE Customer Service Department. Optimum setting and efficient operation of the system are ensured as a result. Commissioning is comprised of the following points:

  • Commissioning of pump(s) according to checklist
  • Functional check of pump(s)
  • Alignment of pump(s)
  • Practice-oriented operation instruction
  • Wilo commissioning protocol

The price for commissioning only applies to system(s) which have been installed in accordance with the installation and operating instructions and state-of-the-art technology. No costs for any materials which may be required are included.

-NET-

Maintenance
Maintenance COMFORT Norm-/SCP pumps
    

In order to ensure and guarantee operational reliability of the pumps/systems, it is recommended to have regular and DIN-compliant inspections and maintenance carried out by the works' own WILO SE Customer Service Department. The tasks are carried out in accordance with DIN 31051 / DIN EN 13306. The tasks comprise the following points:

  • Visual inspection of the pumps/systems
  • Mechanical check
  • Electrical check
  • Testing and possible filling of pressure vessels that may be on hand
  • Review and, if necessary, adjustment of the system parameters
  • Creating a maintenance protocol
  • Consumable materials are included in the contract price
  • Elimination of payroll and travel expenses for deployments between maintenance intervals (during normal service hours)

Scheduling and organisation is performed by WILO. Other individual maintenance offers are possible on request. The price of the maintenance is valid inside Germany.

-NET-

Maintenance PREMIUM Norm-/SCP pumps
    

In order to ensure and guarantee operational reliability of the pumps/systems, it is recommended to have regular and DIN-compliant inspections and maintenance carried out by the works' own WILO SE Customer Service Department. The tasks are carried out in accordance with DIN 31051 / DIN EN 13306. The tasks comprise the following points:

  • Visual inspection of the pumps/systems
  • Mechanical check
  • Electrical check
  • Testing and possible filling of pressure vessels that may be on hand
  • Checking the system parameters
  • Creating a maintenance protocol
  • Consumable materials are included in the contract price
  • Elimination of payroll and travel expenses for deployments between maintenance intervals (during and outside normal service hours)
  • Software updates
  • Includes wearing parts

Scheduling and organisation is performed by WILO. Other individual maintenance offers are possible on request. The price of the maintenance is valid inside Germany.

-NET-

More suitable services

Extended Warranty
Extended Warranty Norm-/SCP pumps
    

In combination of a new pump or system Wilo offers an extended warranty of up to five years in combination with commissioning and maintenance by the Wilo Service.

Extended warranty includes:

  • Full protection and predictable cost security
  • Regular maintenance work by the Wilo Service
WiloCare
WiloCare Comfort
    

WiloCare ist eine digitale Lösung zur Fernüberwachung von Wilo-Pumpen und Pumpensystemen.

Das WiloCare-Konzept steht auf zwei Säulen: der fachgerechten Instandhaltung sowie der digitalen Anlagenüberwachung inkl. sofortiger Information bei Störungen oder Warnmeldungen.

Dafür wird die Anlage mit zusätzlicher Hardware ausgestattet, welche die gewünschten Anlagenparameter direkt in einem individuellen Dashboard, dem Wilo-Monitor, visualisiert. Der Zugriff auf den Wilo-Monitor ist jederzeit mittels PC, Tablet oder Smartphone möglich.

Die benötigte Hardware wird dem Auftraggeber während der Dauer des WiloCare-Vertrags von WILO zur Verfügung gestellt. Es können bis zu 20 Anlagen an die gleiche Hardware angeschlossen werden.

Die Datenübertragen erfolgt via Modbus oder bestehenden Meldekontakten.

Dank der Datenübertragung, werden Störungen und Warnmeldungen sofort via E-Mail oder SMS an den Kunden übermittelt.

Fehler können dadurch schnell und präventiv erkannt und verhindert werden, sodass die Betriebssicherheit der angebundenen Anlagen langfristig abgesichert ist.

Das WiloCare Comfort-Paket umfasst:

  • Wilo-Smart Gateway und zusätzlich benötigte Hardware (Router, SIM-Karte, Antenne, separates Gehäuse)
  • Installation und Inbetriebnahme von WiloCare durch den Wilo-Werkskundendienst
  • Einrichtung des Wilo-Monitors mit definierten Anlagen-Parametern (z.B. Betriebsstunden, Füllstände, Druck oder Betriebszustand)
  • 24 Stunden erreichbare und kostenfreie Notfallrufnummer
  • Überwachung der Anlage durch den Kunden
  • Datenhistorie der letzten Monate
WiloCare Comfort Plus
    

WiloCare ist eine digitale Lösung zur Fernüberwachung von Wilo-Pumpen und Pumpensystemen.

Das WiloCare-Konzept steht auf zwei Säulen: der fachgerechten Instandhaltung sowie der digitalen Anlagenüberwachung inkl. sofortiger Information bei Störungen oder Warnmeldungen.

Dafür wird die Anlage mit zusätzlicher Hardware ausgestattet, welche die gewünschten Anlagenparameter direkt in einem individuellen Dashboard, dem Wilo-Monitor, visualisiert. Der Zugriff auf den Wilo-Monitor ist jederzeit mittels PC, Tablet oder Smartphone möglich.

Die benötigte Hardware wird dem Auftraggeber während der Dauer des WiloCare-Vertrags von WILO zur Verfügung gestellt. Es können bis zu 20 Anlagen an die gleiche Hardware angeschlossen werden.

Die Datenübertragen erfolgt via Modbus oder bestehenden Meldekontakten.

Dank der Datenübertragung, werden Störungen und Warnmeldungen sofort via E-Mail oder SMS an den Kunden übermittelt.

Fehler können dadurch schnell und präventiv erkannt und verhindert werden, sodass die Betriebssicherheit der angebundenen Anlagen langfristig abgesichert ist.

In der WiloCare Comfort PLUS-Ausführung, übernimmt Wilo die Überwachung der Anlagen innerhalb der regulären Öffnungszeiten. Auftretende Störungen und Fehlermeldungen werden schnell und proaktiv von Wilo nachverfolgt und behoben.

Das Comfort WiloCare PLUS-Paket umfasst:

  • Wilo-Smart Gateway und zusätzlich benötigte Hardware (Router, SIM-Karte, Antenne, separates Gehäuse)
  • Installation und Inbetriebnahme von WiloCare durch den Wilo-Werkskundendienst
  • Einrichtung des Wilo-Monitors mit definierten Anlagen-Parametern (z.B. Betriebsstunden, Füllstände, Druck oder Betriebszustand)
  • 24 Stunden erreichbare und kostenfreie Notfallrufnummer
  • Überwachung der Anlage durch den Kunden
  • Überwachung der Anlage durch Wilo (innerhalb der regulären Öffnungszeiten)
  • Datenhistorie der letzten Monate