Search
Contact
E-mail
Catalogue creation
My favorites
Product comparison
Stratos MAXO 30/0,5-6 PN 10 | Wilo
Similar to figure

Stratos MAXO 30/0,5-6 PN 10

Article number: 2164573
Technical data
Hydraulic data
Maximum operating pressure PN 10 bar
Head max H max 6.1 m
Flow max Q max 9.8 m³/h
Minimum suction head at 50 °C m 3 m
Minimum suction head at 95 °C m 10 m
Minimum suction head at 110 °C 16 m
Min. fluid temperature Tmin -10 °C
Max. fluid temperature Tmax 110 °C
Min. ambient temperature Tmin -10 °C
Max. ambient temperature Tmax 40 °C
Motor data
Energy efficiency index (EEI) ≤0.18
Mains connection 1~230 V ±10%, 50/60 Hz
Min current Imin 0.11 A
Max current Imax 0.95 A
Rated power P2 114 W
Min. speed nmin 750 1/min
Max. speed nmax 3050 1/min
Power consumption P1 min 7 W
Power consumption P1 max 135 W
Emitted interference EN 61800-3;2004+A1;2012 /residential area (C1)
Interference resistance EN 61800-3;2004+A1;2012 /industrial environment (C2)
Insulation class F
Protection class IPX4D
Threaded cable connection 5 x M16x1.5
Installation dimensions
Pipe connection on the suction side DNs G 2
Pipe connection on the discharge side DNd G 2
Port-to-port length L0 180 mm
Materials
Pump housing Grey cast iron
Impeller PPS-GF40
Shaft Stainless steel
Bearing Carbon-graphite
Function
Control mode
  • Δp-v for variable differential pressure
  • Δp-c for constant differential pressure
  • Q limit for limiting the maximum volume flow
  • Dynamic Adapt plus
  • ΔT-const. for constant differential temperature control
  • T-const. for constant temperature control
  • Constant Q for constant volume flow control
  • Multi Flow Adaptation
  • Δ T-const. for constant differential temperature control
  • User-defined PID control
  • Constant speed (n-const.)
Special features of the series
  • Heating/Cooling switching
  • Night set back
  • Heat quantity measurement
  • Cooling quantity measurement
  • Key locking function
  • No-Flow Stop
  • Reset function to factory setting
  • Adjustable volume flow limiter
  • Ability to save and restore configured pump settings (3 restoration points)
  • Fault message and warning message in plain text including suggested remedy
Multi pump operation
  • Main/Standby
  • Parallel operation
Measurement value logging Heat and cooling capacity measurement
Display
  • Setpoint
  • Actual delivery head
  • Actual volume flow
  • Actual power consumption
  • Energy consumption
  • Temperature (version “-R7”: current fluid temperature possible with Stratos MAXO temperature sensor)
  • Warning messages in plain text (display status: yellow)
  • Error messages in plain text (display: red)
  • Pump venting (display status: blue)
  • Control mode
  • Active influences (e.g. STOP)
Display (can also be selected)
  • Speed
  • Heating quantity
  • Cooling quantity
  • Operating hours
  • Mains voltage
  • Warning message
  • Error message
Pump venting function Yes
Equipment
Approvals and labels
  • CE
  • VDE
  • EAC
Cold water insulation shell As accessories
Display Graphic colour display (4.3 inches)
Display information Comfort Version: LCD display (large) for showing the head, flow volume, actual und cumulated current.
Pump control Electronic-controlled pump
Quick electrical connection Wilo Connector
Thermal insulation shell Yes
Blocking-current proof motor yes
Particle filter yes
Key lock yes
Connectivity
Access via the Wilo-Assistant app Yes
Analogue signal as standard
  • 0-10 V
  • 2-10 V
  • 4-20 mA
  • 0-20 mA
  • PT1000
Bus communication via additional accessories
  • BACnet MS/TP
  • LON
  • Modbus RTU
  • CANopen
  • PLR
  • BACnet IP
  • Modbus TCP
Connection for Wilo-Smart Cloud Via Wilo-Smart Gateway
Digital input
  • Ext. OFF
  • Ext. MIN
  • Ext. MAX
  • MANUAL (BMS-OFF)
  • Key lock
  • Switchover between heating/cooling mode
Digital output
  • SSM
  • SBM
wire data exchange and remote operation Bluetooth

Stratos MAXO 30/0,5-6 PN 10-P1

Standard: 1~ 230 V, 50/60 Hz, Option: 3~ 230 V, 50/60 Hz

SSM: Collective fault signal (NC contact in accordance with VDI 3814, load capacity 1 A, 250 V ~)

Product data
Brand Wilo
Product description Stratos MAXO 30/0,5-6 PN 10
Article number 2164573
EAN number 4048482699424
Colour Green/black/silver
Minimum order quantity 1
Date of sales availability 2018-11-01
Previous model article number 2090449
Previous model designation Stratos 30/1-6 PN 10
Packaging
Packaging type Cardboard box
Packaging property Transport packaging
Pieces per pallet 32
Number per layer 8
Dimension, weight
Length with packaging 400 mm
Length L 335 mm
Height with packaging 263 mm
Height H 180 mm
Width with packaging 300 mm
Width W 210 mm
Gross weight, approx. m 8.3 kg
Net weight, approx. m 7.2 kg
Tender text

Premium smart-pump Wilo-Stratos MAXO

High-efficiency in-line glandless pump with EC motor and electronic power adjustment. Can be used for chilled water, heating water and water/glycol mixtures. Energy efficiency index (EEI) between ≤ 0.17 and ≤ 0.19 depending on pump type.

Control modes:

  • Permanent, automatic performance adjustment according to system requirements without setpoint specification Wilo Dynamic Adapt plus (factory setting). Up to 20% energy savings compared to dp-v control mode.
  • Constant temperature (T-const.)
  • Constant differential temperature (dT-const.)
  • Needs-based volume flow optimisation of the feeder pump through connectivity and communication between multiple pumps (Multi-Flow Adaptation).
  • Constant volume flow (Q-const.)
  • Differential pressure control (dp-c) to a remote point in the pipe network (index circuit evaluator)
  • Constant differential pressure (dp-c)
  • Variable differential pressure (dp-v) with the option to set the nominal duty point
  • Constant speed (n-const.)
  • User-defined PID control

Functions:

  • Heat quantity measurement
  • Cooling quantity measurement
  • Pump automatically deactivates when no flow is detected (No-Flow Stop)
  • Switchover between heating and cooling mode (automatic, external or manual)
  • Adjustable volume flow limiter using the Q-Limit function (Qmin. and Qmax.)
  • Dual-pump operations: Efficiency-optimised parallel operation for dp-c and dp-v, main and standby operation
  • Ability to save and restore configured pump settings (3 restoration points)
  • Fault and warning messages shown in plain text with advice on resolving the issue
  • Pump venting function for automatic venting of the rotor chamber
  • Automatic night setback
  • Automatic deblocking function and integrated full motor protection
  • Dry-running detection

Display:

  • Control mode
  • Setpoint
  • Volume flow
  • Temperature
  • Power consumption
  • Electric consumption
  • Active influences (e.g. STOP, No-Flow Stop)

Version:

  • 2 configurable analogue inputs: 0–10 V, 2–10 V, 0–20 mA, 4–20 mA and commercially available PT1000; +24 V DC power supply
  • 2 configurable digital inputs (Ext. OFF, Ext. Min, Ext. Max, heating/cooling, manual override (uncoupled from building automation), operation lock (key lock and remote operation configuration protection))
  • 2 configurable signal relays for run signals and fault messages
  • Slot for Wilo-CIF modules with interfaces for building automation BA (optional accessories: CIF modules Modbus RTU, Modbus TCP, BACnet MS/TP, BACnet IP, LON, PLR, CANopen)
  • Wilo Net as a Wilo system bus for communication between Wilo products, e.g. Multi-Flow Adaptation; dual-pump operation and Wilo-Smart Gateway
  • Integrated temperature sensor
  • Automatic emergency operation with definable pump speed for exceptional circumstances, e.g. bus communication or sensor value malfunction
  • Graphic colour display (4.3 inches) with one-button manual operation
  • Use the Wilo-Assistant app to read and set operating data and –among other things– set up a commissioning protocol through the Bluetooth interface (no further accessories required)
  • Integrated dual-pump management (twin-head pumps are prewired) when using 2 single pumps as two-pump unit (connection via Wilo Net)
  • Cable break detection when using an analogue signal (in connection with 2 – 10 V or 4 – 20 mA)
  • Outdoor installation with weather protection possible in accordance with the installation and operating instructions
  • Pre-set date and time
  • Thermal insulation shell for heating applications

Scope of delivery

  • Pump
  • Optimised Wilo-Connector the same for all sizes
  • 2x threaded cable gland M16 x 1.5
  • Washers for flange screws M12 and M16 (for nominal connection diameters DN 32 to DN 65)
  • 2x gaskets for threaded connection
  • Thermal insulation shell
  • Concise Installation and operating instructions

Optional accessories:

  • ClimaForm cold insulation to avoid the formation of condensate
  • CIF module: Modbus TCP, Modbus RTU, BACnet IP, BACnet MS/TP, LON, PLR, CANopen
  • PT 1000 (B) pipe contact sensor (for domestic hot water)
  • PT 1000 (AA) sensor for installation in immersion well
  • Differential pressure sensor
Operating Data
Min. fluid temperature Tmin -10 °C
Max. fluid temperature Tmax 110 °C
Min. ambient temperature Tmin -10 °C
Max. ambient temperature Tmax 40 °C
Maximum operating pressure PN 10 bar
Minimum suction head at 50 °C m 3 m
Minimum suction head at 95 °C m 10 m
Minimum suction head at 110 °C 16 m
Motor data
Energy efficiency index (EEI) ≤0.18
Mains connection 1~230 V ±10%, 50/60 Hz
Min current Imin 0.11 A
Max current Imax 0.95 A
Rated power P2 114 W
Min. speed nmin 750 1/min
Max. speed nmax 3050 1/min
Power consumption P1 min 7 W
Power consumption P1 max 135 W
Emitted interference EN 61800-3;2004+A1;2012 /residential area (C1)
Interference resistance EN 61800-3;2004+A1;2012 /industrial environment (C2)
Insulation class F
Protection class IPX4D
Threaded cable connection 5 x M16x1.5
Materials
Pump housing Grey cast iron
Impeller PPS-GF40
Shaft Stainless steel
Bearing Carbon-graphite
Installation dimensions
Pipe connection on the suction side DNs G 2
Pipe connection on the discharge side DNd G 2
Port-to-port length L0 180 mm
Ordering information
Brand Wilo
Product description Stratos MAXO 30/0,5-6 PN 10
Net weight, approx. m 7.2 kg
Article number 2164573
Documents

Installation and operating instructions

Wilo-Stratos MAXO/-D/-Z

Article Number 2226400
Edition 2023-02
Number of pages 60
Language en
PDF (4 MB)

Group Statement

Group Statement REACH

Edition 2021-05
Number of pages 5
Language language neutral
PDF (327 KB)

Release notes Software

Release notes Stratos MAXO

Article Number 2212705
Edition 2021-04
Number of pages 60
Language bg, cs, da, de, el, en, es, et, fi, fr, hr, hu, it, lt, lv, nl, no, pl, pt, ro, ru, sk, sl, sr, sv, tr, uk
PDF (4 MB)

UN38.3

Lithium Battery UN38.3 Test 2020-0000020779

Number of pages 1
Language language neutral
PDF (179 KB)
BIM/CAD
Accessory

Continuous, infinitely variable control, differential pressure-sensitive CCe-HVAC system (24)

Continuous, infinitely variable control, temperature-dependent CCe-HVAC system (18)

Cold insulation (1)

Pipe installation (2)

Pipe installation, adapter fitting (18)

Pump control/accessories (30)

Pump control/interface module (6)

Differential pressure detection (7)

Plug (1)

Services

With Wilo as your partner, you can not only be sure of choosing high-quality product solutions, but also of benefiting from a comprehensive, worry-free package of well thought-out services. We collaborate to develop a service concept tailored to your individual needs; with our expertise and personal consultancy, we make sure that the operation of your systems is as energy-efficient, reliable and economical as possible. All the while our competent Wilo service technicians are ready to assist you with fast, reliable and on-time support.

Read more

Recommended services

Wilo-Live Assistant
Wilo-Live Assistant Service
    
2216415

The Wilo-Live Assistant is a technical advisor at your side during pump service. By using the Wilo-Live Assistant, our expert advisers can support you in the boiler or equipment room via video transmission – live and in real time. You use your smartphone to show the installation set-up, while the Wilo expert follows everything on their screen. They can see the components as well as other details and can thus determine where the fault or breakdown originates. We prevent downtime and ensure operational reliability of your pumps and systems!

The Wilo-Live Assistant includes:

  • Interactive live support via video chat
  • Direct contact with an expert
  • Just-in-time solution to ensure maximum operational reliability of your pumps and systems
System Optimisation
System Optimisation Glandless pumps
    
2219250

The Wilo Service offers proactive system optimisation by optimising settings and doing minor adjustments to ensure operational reliability. System Optimisation includes among others:

  • Overhaul of pumps/systems to restore full performance
  • Addition of new technologies or functions in older systems to save on capital expenditures (retrofitting)
Energy Solutions
Energy Solutions Glandless pumps
    
2219285

Wilo Service offers a proactive support to point out possible energy savings. Our service creates an overview of all installed assets to show how the energy consumption of pumps or systems can be reduced. We offer targeted consultancy and analysis, including the involvement of subsidies as well as comprehensive support around the changeover to high-efficiency technologies. Wilo-Energy solution includes:

  • Detailed assessment of the life cycle costs (LCC analysis)
  • Energy audit including information about energy saving potential
  • Proactive recommendation of replacement options
  • Improving the environmental performance of your system
  • Support in the changeover to Wilo high-efficiency pumps

More suitable services

Extended Warranty
Extended Warranty Glandless pumps
    
2219589

In combination of a new pump or system Wilo offers an extended warranty of up to five years in combination with commissioning and maintenance by the Wilo Service.

Extended warranty includes:

  • Full protection and predictable cost security
  • Regular maintenance work by the Wilo Service
Supervision
Supervision Glandless pumps
    
2219320

Wilo supports during the concept phase to ensure quality work and cost efficiency. Our competent and qualified Wilo Service will support you with recommendations and technical advice throughout the entire project.

Supervision includes:

  • Regular on-site visits ensure the quality of information and advice
  • Technical consultancy, also available on site
  • Status report with recommendations after the visit
  • Comprehensive support from a Wilo expert
Installation
Installation Glandless pumps
    
2219355

The Wilo service offers installation of our pumps or pumping systems. We offer an end-to-end process from gathering information on site to installing our product in the overall plant. An optimal installation set-up and the interaction of various individual factors lay the foundation for long-term operational safety.

Installation includes:

  • Professional inspection
  • Provision of components/materials from Wilo and third-party suppliers
  • Installation of pipelines and electronics
  • Test runs
Commissioning
Commissioning Glandless pumps
    
2219390

For perfect functioning of the pump(s) / system(s), it is recommended to have the commissioning carried out by the works' own WILO SE Customer Service Department. Optimum setting and efficient operation of the system are ensured as a result. Commissioning is comprised of the following points:

  • Commissioning of system(s) according to checklist
  • Parameterisation and setting of switchgear
  • Testing and adaptation of initial compressing of pressure tanks (filling up to 80 litres incl.)
  • Functional check of fitted system(s)
  • Practice-oriented operation instruction
  • Wilo commissioning protocol

The price for commissioning only applies to system(s) which have been installed in accordance with the installation and operating instructions and state-of-the-art technology. No costs for any materials which may be required are included.

Maintenance
Maintenance BASIC Glandless pumps
    
2219530

In order to ensure and guarantee operational reliability of the pumps/systems, it is recommended to have regular and DIN-compliant inspections and maintenance carried out by the works' own WILO SE Customer Service Department. The tasks are carried out in accordance with DIN 31051 / DIN EN 13306. The tasks comprise the following points:

  • Visual inspection of the pumps/systems
  • Mechanical check
  • Electrical check
  • Testing pressure vessels that may be on hand
  • Review and, if necessary, adjustment of the system parameters
  • Creating a maintenance protocol

Scheduling and organisation is performed by WILO. Other individual maintenance offers are possible on request.

Maintenance COMFORT Glandless pumps
    
2219416

In order to ensure and guarantee operational reliability of the pumps/systems, it is recommended to have regular and DIN-compliant inspections and maintenance carried out by the works' own WILO SE Customer Service Department. The tasks are carried out in accordance with DIN 31051 / DIN EN 13306. The tasks comprise the following points:

  • Visual inspection of the pumps/systems
  • Mechanical check
  • Electrical check
  • Testing and possible filling of pressure vessels that may be on hand
  • Review and, if necessary, adjustment of the system parameters
  • Creating a maintenance protocol
  • Consumable materials are included in the contract price
  • Elimination of payroll and travel expenses for deployments between maintenance intervals (during normal service hours)

Scheduling and organisation is performed by WILO. Other individual maintenance offers are possible on request.

Maintenance PREMIUM Glandless pumps
    
2219545

In order to ensure and guarantee operational reliability of the pumps/systems, it is recommended to have regular and DIN-compliant inspections and maintenance carried out by the works' own WILO SE Customer Service Department. The tasks are carried out in accordance with DIN 31051 / DIN EN 13306. The tasks comprise the following points:

  • Visual inspection of the pumps/systems
  • Mechanical check
  • Electrical check
  • Testing and possible filling of pressure vessels that may be on hand
  • Checking the system parameters
  • Creating a maintenance protocol
  • Consumable materials are included in the contract price
  • Elimination of payroll and travel expenses for deployments between maintenance intervals (during and outside normal service hours)
  • Software updates
  • Includes wearing parts

Scheduling and organisation is performed by WILO. Other individual maintenance offers are possible on request.

Repair
Repair Glandless pumps
    
2219609

Wilo Service draws on their competence and experience while consulting on site to decide whether the pump can actually be repaired on site or has to be sent in for a factory repair. Wilo also provides spare parts or a replacement pump to restore the operational reliability of the system.

Repair includes:

  • Verification and elimination of error causes by experienced Wilo experts
  • Non-binding estimate for repairs
  • Electric-hydraulic test run to ensure correct data regarding functionality, quality and performance of the pump or system
  • Coating of various pump or system components for an optimised efficiency factor
  • Use of genuine spare parts only
  • Documentation of the repair in the service report